What is a change impact assessment?
A change impact assessment is a structured look at what a decided change will do to the people who must work with it. For each affected group it rates how much the change alters their processes, systems and tools, role, skills, behaviours, reporting lines, performance measures, pay, location, and workload, for example as high, medium, low, or none. The result shows which groups carry the most change and where support has to go before the change is announced.
Is a change impact analysis the same thing?
In practice, yes. Change practitioners use change impact assessment and change impact analysis for the same work: comparing how a group works today with how it will work after the change, and rating the size of the difference. This page treats the two names as one.
What are the 10 aspects of change impact according to Prosci?
Prosci's 10 aspects of change impact are processes, systems, tools, job roles, critical behaviors, mindsets, attitudes and beliefs, reporting structure, performance reviews, compensation, and location. Prosci uses them to translate an organization-wide change into what changes in an individual's job. The grid on this page merges systems with tools and behaviors with mindsets, and adds skills and workload from the University of Exeter's change blueprint.
When should a change impact assessment be done?
Early, once the change is decided and can be described precisely, and before the change plan, training, and communication are fixed. The University of Exeter's change blueprint places it in the diagnose phase, alongside the future state definition and the stakeholder analysis. Repeat it when the scope, the date, or the affected groups change.
Who should complete the assessment?
A change or project lead can run it, but the ratings should come from functional and process experts and from the people who will use the new way of working in every affected group. Validating the ratings with each group matters as much as the first draft, because it also shows how each group is likely to react.
How do you rate an impact as high, medium, or low?
High means a large shift in what the group does, owns, or must know: extensive process or system change, real behaviour change, or changed working relationships. Medium means some of those shifts with dependencies to manage. Low means minor process or system changes and no behaviour change required. Rate each group separately, because the same change can be high for one group and low for another.
Is there a change impact assessment template?
The impact grid on this page works as one, with no download, sign-up, or account. Rate up to four groups across ten dimensions, read the heat map, and print the result. It is not offered as a file because a grid filled in once by a project office, without the affected groups, measures the planner's assumptions rather than the impact.
What happens after a change impact assessment?
Each high impact becomes a change intervention with an owner and a date: change leadership development, a change network, targeted communication, training, organization design, culture and behaviour work, resistance management, or a pilot. The University of Exeter's change blueprint has the finished assessment reviewed and signed off by the change governance, and the interventions become the core of the change strategy and the change management plan. Then score readiness for the same change.
How is a change impact assessment different from a business impact analysis?
A business impact analysis is a continuity planning tool: it predicts the operational and financial consequences of a disruption, such as a site, system, or supplier failure, and ranks which functions to restore first. A change impact assessment looks at a planned change and what it does to people's daily work. One plans for something going wrong; the other plans for something being changed on purpose.